KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
Work Logs Found: 606
Category Work Time: 2381 Hours
 Date
Hours
Work Log Summary

Details

 03-19-2011
0.00
Unrestricted Certificate of Airworthiness received
Details
     

 07-10-2010
0.00
First flight of C-FZUM
Details
       

 07-06-2010
0.00
Special Certificate of Airworthiness received
Details
     

 07-05-2010
2.50
Final inspection snag rectification
Details
       

 07-03-2010
4.00
Final inspection
Details
       

 06-26-2010
2.50
Final inspection preparations
Details
     

 06-19-2010
4.50
Ignition wiring securing...
Details
       

 06-12-2010
6.50
Weight and balance
Details
       

 06-05-2010
5.00
Magneto reinstallation...
Details
       

 05-28-2010
4.00
Seat belt installation...
Details
       

 05-20-2010
3.50
Upholestry installation...
Details
       

 05-18-2010
0.00
Ignition system news
Details

 05-11-2010
0.00
RV Transition Training completed
Details
       

 05-07-2010
4.00
Engine starting troubleshooting continued
Details

 05-01-2010
4.00
Engine starting troubleshooting continued
Details

 04-29-2010
4.00
Engine starting troubleshooting
Details

 04-24-2010
4.00
Engine kick back troubleshooting
Details

 04-23-2010
5.00
Oil system plug installation...
Details
     

 04-17-2010
5.00
Engine run preparations...
Details
       

 04-13-2010
2.00
Engine ignition system timing set up
Details
     

 04-09-2010
6.00
Placard installation...
Details
       

 04-07-2010
4.00
First aid kit retainer bracket riveting...
Details
       

 04-06-2010
3.00
First aid kit mounting
Details
     

 04-05-2010
5.00
Right tank reinstallation
Details
     

 03-31-2010
1.00
Right fuel tank resealing
Details
     

 03-27-2010
4.50
Baggage comparment tie down installation...
Details
       

 03-26-2010
4.00
Cabin floor installation...
Details
     

 03-24-2010
0.50
Right fuel tank leak check
Details
       

 03-23-2010
1.00
New BNC connector installed in right fuel tank
Details
       

 03-17-2010
2.00
Fairing installation
Details
       

 03-11-2010
1.00
Right fuel tank defective BNC connector removal
Details
     

 03-10-2010
1.00
Right fuel tank opening
Details
       

 03-09-2010
4.00
Autopilot controller connector jumper installed...
Details
       

 03-06-2010
4.50
Display Software update...
Details
       

 03-01-2010
0.00
Final inspection request filed
Details
     

 02-26-2010
4.50
Display System Instrument Calibration inputed...
Details
       

 02-19-2010
5.50
Fuel quantity indicating system calibration
Details
     

 02-12-2010
8.00
Rudder fairing installation...
Details
       

 02-05-2010
8.00
Lighting, flap, aileron, AOA and brake system work
Details
       

 02-02-2010
7.75
Autopilot, display and lighting connected
Details
       

 01-28-2010
8.50
Wing and empenage attachment completed...
Details
       

 01-23-2010
5.25
Moving fuselage to the airport
Details
       

 01-20-2010
5.00
Taking parts to the airport
Details
       

 01-19-2010
3.00
Component packing for moving
Details
       

 01-11-2010
3.25
Canopy finishing...
Details
       

 01-10-2010
7.50
Fire extinguisher installation...
Details
       

 01-04-2010
3.00
Cowling iterations carried out
Details
       

 01-03-2010
9.50
Propeller installation...
Details
       

 01-02-2010
2.75
XM antenna installation...
Details
     

 01-01-2010
10.00
Finishing odds and ends
Details
     

 12-12-2009
1.00
Engine cooling air intake rings painting
Details
     

 12-11-2009
9.00
Multiple firewall forward items secured...
Details
       

 12-10-2009
8.00
Engine cowling and fairings paint touch up...
Details
       

 12-09-2009
2.25
Cowling accent color painting
Details
     

 12-08-2009
5.00
Engine cowling painting continued
Details
       

 12-07-2009
2.00
Upper engine colwing painting...
Details
       

 12-06-2009
1.50
Upper engine cowling UV blocker application...
Details
       

 12-05-2009
2.25
Upper engine cowling priming...
Details
       

 12-03-2009
7.00
Lower engine cowling painting...
Details
       

 12-02-2009
8.75
Sanding lower engine cowling...
Details
       

 12-01-2009
4.00
Lower engine cowling sanding
Details
     

 11-30-2009
4.50
Engine cowling outer face sanding...
Details
       

 11-29-2009
2.00
Upper cowling sanding
Details
     

 11-28-2009
1.25
Engine cowl micro application and sanding
Details
       

 11-27-2009
1.00
Wing to body fairing painting...
Details
       

 11-26-2009
2.00
Wing to body fairings primed...
Details
       

 11-25-2009
5.50
Wing to body fairing cleaning, etching....
Details
       

 11-24-2009
5.50
Gear leg fairing repaint
Details
       

 11-23-2009
3.50
Landing and taxi light connectors added
Details
       

 11-22-2009
6.75
Flap & elavator tab safetying....
Details
       

 11-21-2009
2.00
Fairing painting
Details
       

 11-20-2009
1.00
Gear leg & intersection fairing UV blocker
Details
     

 11-19-2009
2.50
Gear leg & intersection fairing sanding/ priming
Details
     

 11-18-2009
2.75
Wheel fairing painting
Details
       

 11-17-2009
2.75
Fairing paint preparations continued...
Details
       

 11-16-2009
3.00
Fairing and cowling paint preparation
Details
       

 11-15-2009
4.00
Nose wheel fairing preparation...
Details
       

 11-14-2009
6.00
Engine induction filter assembly installation
Details
     

 11-13-2009
2.00
Main wheel fairing painting
Details
     

 11-11-2009
1.25
Main wheel fairing UV blocker applied
Details
     

 11-10-2009
2.75
Main wheel fairing sanding and priming
Details
       

 11-08-2009
4.50
Wheel fairing preparation continued
Details
       

 11-06-2009
3.00
Wheel fairing sanding and priming
Details
     

 10-31-2009
4.50
Gear leg upper intersection fairing preparations
Details
       

 10-30-2009
1.00
Wheel fairing epoxy coating applied
Details
     

 10-29-2009
3.00
Wheel fairing paint preparation
Details
     

 10-21-2009
1.75
Wing tip fairings painted
Details
     

 10-20-2009
3.00
Wing tip fairing primer and UV blocker applied
Details
       

 10-19-2009
2.00
Primed wing tip fairings
Details
     

 10-18-2009
1.50
Wing fairing paint preparation
Details
       

 10-16-2009
5.25
Elevator painting & gear fairing preparation
Details
       

 10-15-2009
6.00
Elevator priming & gear leg intersection fairings
Details
       

 10-14-2009
1.75
Elevator paint preparations continued
Details
     

 10-13-2009
3.00
Elevator painting preparations
Details
       

 10-12-2009
1.75
Horizontal stabilizer painting
Details
       

 10-11-2009
2.00
Horizontal stabilizer priming...
Details
       

 10-10-2009
9.25
Tying up firewall forward loose ends
Details
       

 10-09-2009
2.75
Rudder and vertical stabilizer continued...
Details
       

 10-08-2009
4.00
Rudder and vertical stabilizer priming...
Details
       

 10-07-2009
2.50
Rudder & vertical stabilizer cleaning, etching...
Details
     

 10-05-2009
3.00
Ailerons and flaps painted
Details
       

 10-04-2009
3.25
Flap and aileron priming...
Details
       

 10-03-2009
9.25
Post paint engine reinstallation
Details
       

 10-02-2009
9.45
Fuselage accent stripe and registration painting
Details
       

 10-01-2009
8.75
Fuselage painting...
Details
       

 09-30-2009
7.50
Fuselage priming...
Details
       

 09-29-2009
8.00
Fuselage preparation for painting
Details
       

 09-28-2009
7.25
Forward cabin covers, canopy, paint planning
Details
       

 09-27-2009
10.00
Firewall preparation prior to painting...
Details
       

 09-26-2009
5.00
Firewall sealant application
Details
       

 09-25-2009
5.50
Engine removal prior to painting fuselage
Details
       

 09-24-2009
5.50
Right wing painting, engine alternate air intake
Details
       

 09-23-2009
8.75
Engine intake alternate air selector valve prep...
Details
       

 09-22-2009
6.50
Wing repainting & engine air filter preparation
Details
       

 09-21-2009
6.50
Wing painting & engine air intake work
Details
       

 09-20-2009
7.75
Cabin heat muff installation...
Details
       

 09-19-2009
10.00
Engine exhaust and ignition lead securing...
Details
       

 09-18-2009
4.00
Cowling engine cooling intake ring sanding...
Details
       

 09-17-2009
2.00
Riveted cowling forward flange nut plates...
Details
       

 09-16-2009
7.50
Engine baffle and pleunum installation...
Details
       

 09-15-2009
8.25
Lower cowling air exit attach bracket
Details
       

 09-14-2009
2.25
Cowling oil filler door completed...
Details
       

 09-13-2009
3.00
Upper cowling oil filler door installation
Details
       

 09-12-2009
3.00
Upper cowling oil filler door fabrication
Details
       

 09-11-2009
1.50
Cowling engine combustion air inlet bonded...
Details
       

 09-10-2009
5.00
Engine baffle trimming...
Details
       

 09-09-2009
7.00
Cowling fastener retainer strip riveting...
Details
       

 09-08-2009
20.00
Cowling installation
Details
       

 09-02-2009
7.00
Lower cowling fitting
Details
       

 09-01-2009
7.50
Prop installation and upper cowling fitting
Details
       

 08-30-2009
5.75
Wiring securing and protecting...
Details
       

 08-28-2009
2.25
Component aluminium protective vinyl removal
Details
       

 08-27-2009
0.50
Forward upper fuselage access panel gasket trim
Details
     

 08-26-2009
1.50
Left and right navigation light installation
Details
       

 08-25-2009
8.50
Tail fairing retaining screw anchor nuts...
Details
       

 08-24-2009
4.75
Aft nav and strobe light wiring continued...
Details
       

 08-23-2009
3.50
Fuel tank vent line reinstallation...
Details
       

 08-22-2009
5.75
Fuselage upper forward skin riveting...
Details
       

 08-18-2009
3.25
Horizontal to vertical stab fairing iterations
Details
     

 08-17-2009
5.25
Stabilzer fairing fitting
Details
       

 08-16-2009
3.50
Elevator trim wiring & stab fairing installation
Details
       

 08-15-2009
5.50
ELT antenna installation...
Details
       

 08-14-2009
6.00
ELT remote control panel wiring
Details
       

 08-11-2009
1.00
Post paint instrument panel repopulation
Details
     

 08-10-2009
1.50
Post paint instrument panel repopulation
Details
     

 08-09-2009
8.00
Instrument panel removal and painting...
Details
       

 08-08-2009
4.75
ELT installation...
Details
       

 08-07-2009
4.00
Aft Nav light and ELT installation
Details
       

 08-05-2009
1.50
EFIS harness installation completed
Details
     

 08-04-2009
1.50
Left EFIS wiring harness installation continued
Details
     

 08-03-2009
2.50
EFIS harness installation...
Details
       

 07-15-2009
5.75
AOA system tubing installation...
Details
       

 07-14-2009
2.75
Forward upper deck access panel installation
Details
       

 07-07-2009
10.25
AOA flap switch wiring...
Details
       

 07-06-2009
3.50
Elevator trim wiring installation...
Details
       

 07-05-2009
9.00
Control stick to systems interface wiring
Details
       

 07-03-2009
1.25
Autopilot installation continued
Details
       

 07-02-2009
2.75
Autopilot installation continued
Details
       

 07-01-2009
2.50
Autopilot installation continued
Details
       

 06-30-2009
6.50
Autopilot installation
Details
       

 06-28-2009
7.00
Pitot plumbing installation
Details
       

 06-27-2009
2.00
Transponder antenna coaxial cable fabrication...
Details
     

 06-21-2009
5.00
Pitot/Static manifold installation...
Details
       

 06-14-2009
8.25
Transponder antenna installation
Details
       

 06-11-2009
3.00
Strobe light circuit wiring
Details
     

 06-10-2009
8.75
Canopy wiring disconnect installed...
Details
       

 06-08-2009
1.75
Ray Allen trim servo wiring connector
Details
     

 06-07-2009
6.00
Flap position switch installation...
Details
       

 06-05-2009
3.50
Flap position switch installation
Details
     

 05-29-2009
6.00
Stick grip wiring and installation
Details
     

 05-21-2009
5.25
Wiring continued...
Details
       

 05-20-2009
7.25
Glareshield lighting wiring continued...
Details
       

 05-19-2009
4.00
Magnetometer installation...
Details
       

 05-18-2009
4.00
Transponder back shell installation...
Details
       

 05-17-2009
1.00
Landing and taxi light wiring continued
Details
     

 05-16-2009
1.50
Landing light and taxi light circuit wiring
Details
     

 05-15-2009
1.50
Buss switch reorientation
Details
       

 05-13-2009
6.50
GPS and Transponder installation
Details
       

 05-12-2009
10.75
Communications radio installation
Details
       

 05-10-2009
3.25
Audio panel mount fabrication
Details
     

 05-08-2009
1.25
Fuel pump electrical circuit wired
Details
     

 05-07-2009
1.25
Starter solenoid ground circuit rewiring
Details
     

 05-06-2009
3.50
Flap circuit wiring...
Details
     

 05-05-2009
6.75
Magnetometer installation...
Details
       

 05-03-2009
9.00
Magnetometer installation...
Details
       

 04-27-2009
4.00
Primer, starter...wiring
Details
       

 04-26-2009
1.00
Master and starter solenoid diodes installed
Details
     

 04-26-2009
6.50
Electrical system control and indication wiring
Details
       

 04-19-2009
4.75
Magnetometer installation
Details
       

 04-19-2009
4.00
Comm radio antenna installation
Details
       

 04-18-2009
3.75
Wiring continued...
Details
       

 04-17-2009
5.50
Engine wiring continued
Details
       

 04-16-2009
5.00
Wiring continued...
Details
       

 04-12-2009
1.50
Prop control cable firewall shield installed...
Details
       

 04-10-2009
3.75
Wiring continued...
Details
       

 04-08-2009
8.25
Engine harness preparation
Details
       

 04-07-2009
5.25
Wiring preparations
Details
       

 04-06-2009
7.50
Engine primer installation
Details
       

 04-04-2009
5.75
Electrical and fuel system fitting
Details
       

 04-03-2009
2.75
Wiring installation
Details
       

 04-02-2009
4.75
Engine control cable installation...
Details
       

 04-02-2009
2.00
Engine control cable installation
Details
       

 04-01-2009
6.00
Map box, park brake cable and heater control cable
Details
       

 03-31-2009
6.75
Panel switch installation...
Details
     

 03-29-2009
1.00
Panel switch hole drilling
Details
     

 03-28-2009
2.50
Panel switch and indicator light holes drilled
Details
     

 03-27-2009
1.00
Mounted lights dimmer...
Details
       

 03-26-2009
6.50
Engine manifold pressure transducer installation..
Details
       

 03-25-2009
8.00
Fuel and electrical system component installation
Details
       

 03-24-2009
4.75
Engine fuel flow transducer mounting
Details
       

 03-23-2009
2.50
Engine manifold pressure manifold completed
Details
       

 03-19-2009
2.50
Electrical components installation...
Details
       

 03-18-2009
7.50
Electrical component mount assembly continued
Details
       

 03-17-2009
5.00
Electrical system component mount fabricated
Details
     

 03-11-2009
2.50
Electrical harness snap bushings installed
Details
       

 03-07-2009
3.00
Rudder lower fairing installation
Details
       

 03-02-2009
2.00
Fuel flow transducer mount fabricated
Details
     

 03-01-2009
6.75
Main alternator installation...
Details
       

 02-27-2009
2.00
Back up alternator installation...
Details
       

 02-25-2009
0.00
Electrical system order arrives
Details
     

 02-21-2009
3.00
Engine to firewall ground cable installation...
Details
       

 02-20-2009
1.75
Fuel pump overflow line installed...
Details
       

 02-19-2009
3.25
Fabricated panel extension
Details
       

 02-06-2009
6.50
Wing tip fairing completion
Details
       

 02-05-2009
2.50
Oil pressure restrictor fitting installation...
Details
       

 02-05-2009
1.75
Fuel line installation...
Details
       

 01-20-2009
3.00
Oil and fuel pressure transducer installation...
Details
       

 01-20-2009
1.50
EGT and CHT probe installation
Details
       

 01-19-2009
2.00
Engine exhaust system fitting
Details
     

 01-12-2009
3.00
Radio stack support installation
Details
       

 12-20-2008
6.00
Fuel line and electrical cable installation
Details
       

 12-13-2008
10.00
Main wheel fairing preparation
Details
       

 12-06-2008
2.50
Engine mounting
Details
     

 12-04-2008
1.50
Instrument panel second display hole cut
Details
       

 12-03-2008
4.00
Nose wheel fairing iterations
Details
       

 11-28-2008
5.75
Instrument panel support rib and display install
Details
       

 11-23-2008
1.50
Landing gear fairing support bracket installation
Details
       

 11-22-2008
5.00
Propeller governor installation...
Details
       

 11-16-2008
1.00
Carburetor installation
Details
     

 11-15-2008
5.75
Wheel fairing bracket alodining and priming...
Details
       

 11-07-2008
5.00
Engine baffle preparation
Details
       

 11-05-2008
1.50
Engine baffle preparation
Details
     

 11-02-2008
4.00
Engine baffle preparation
Details
       

 10-20-2008
0.00
Aero Sport Power engine arrives
Details
       

 10-19-2008
1.75
Cowling mounting flange preparation continued
Details
       

 10-18-2008
4.75
Cowling mounting flange preparation
Details
       

 10-10-2008
0.00
The propeller arrives
Details
       

 10-03-2008
3.50
Instrument panel preparation
Details
       

 10-02-2008
4.00
Radio stack installation preparations
Details
       

 09-27-2008
6.25
Landing gear fairing preparation
Details
       

 08-31-2008
2.25
Landing gear fairing preparation
Details
       

 08-30-2008
4.00
Main wheel fairing preparation
Details
       

 08-16-2008
3.50
Main wheel fairing opening trimming
Details
     

 08-15-2008
4.75
Nose gear fairing installation
Details
       

 07-28-2008
0.00
Oshkosh 2008
Details
       

 07-28-2008
0.00
Oshkosh 2008
Details
       

 06-26-2008
8.00
Right wheel, leg and intersection fairing ...
Details
       

 06-25-2008
6.00
Main wheel fairing installation
Details
       

 06-20-2008
3.00
Main wheel fairing installation preparation
Details
       

 06-19-2008
2.75
Gear leg fairing hinge installation
Details
       

 06-18-2008
5.25
Brake line and gear leg fairing installation
Details
       

 06-17-2008
4.25
Main and nose gear installation
Details
       

 06-16-2008
1.50
Nose gear preparations
Details
       

 06-15-2008
2.00
Right wheel and brake assembly mounting
Details
       

 06-14-2008
3.75
Left wheel and brake assembly mounting
Details
     

 06-12-2008
2.25
Canopy latch handle knob installation...
Details
       

 06-11-2008
0.75
Flap fitting rivet replacing
Details
       

 06-10-2008
5.00
Aileron trim installation completed
Details
       

 06-09-2008
6.00
Rear window and aileron trim installation
Details
       

 06-08-2008
6.00
Wing root fairing anchor nut installation
Details
       

 06-07-2008
8.50
Floor, baggage bulkhead and seat back installation
Details
       

 06-02-2008
8.00
F-774 upper skin and rollover bar installation
Details
       

 06-01-2008
6.25
Wing to fuselage fairing and flap installation
Details
       

 05-31-2008
8.00
Wing to fuselage mating
Details
       

 05-26-2008
3.75
Fuselage support saw horse fabrication...
Details
       

 05-25-2008
6.50
Canopy lift strut and control stick installation
Details
       

 05-18-2008
7.50
Canopy latch installation continued
Details
       

 04-27-2008
7.50
Canopy to forward skin fiberglassing
Details
       

 04-23-2008
1.50
Riveted aileron up stops
Details
     

 04-23-2008
4.00
Canopy to forward skin fiberglassing
Details
       

 04-20-2008
2.00
Canopy side skirt riveting...
Details
       

 04-17-2008
1.00
Canopy forward skin painting...
Details
       

 04-16-2008
3.50
Wing tip fairing, canopy and wing to body fairing
Details
       

 04-15-2008
4.00
Wing to body fairing...
Details
     

 04-14-2008
6.75
Wing tip fairing fitting
Details
       

 04-12-2008
0.75
Wing tip fairing fitting
Details
     

 04-11-2008
2.25
Wing tip fairing fitting
Details
       

 04-10-2008
1.75
Left wing tip fairing fitting
Details
     

 04-08-2008
4.25
Right flap installation
Details
       

 04-07-2008
5.00
Aileron and flap installation
Details
       

 04-06-2008
7.00
Aileron installation and rigging
Details
       

 04-02-2008
3.25
Static line and baggage area covers installation
Details
       

 03-31-2008
2.25
Fabricated the elevator push tube tunnel cover
Details
     

 03-29-2008
8.25
Canopy skin installation...
Details
       

 03-28-2008
5.00
Canopy side skirt installation
Details
       

 03-27-2008
7.25
Canopy preparations
Details
       

 03-26-2008
4.00
Canopy preparations
Details
       

 03-25-2008
5.75
Canopy preparations
Details
       

 03-24-2008
3.25
Canopy preparations
Details
       

 03-17-2008
1.75
Panel mounted map box installation
Details
       

 03-16-2008
2.25
Canopy fitting and trimming
Details
       

 03-15-2008
7.25
Fitting the plexiglass canopy
Details
       

 03-14-2008
3.75
Canopy component cleaning, abrading...
Details
       

 03-13-2008
6.50
Canopy reinforcement brace
Details
       

 03-06-2008
7.50
Canopy frame preparations
Details
       

 03-05-2008
4.25
Canopy frame finishing
Details
     

 03-04-2008
5.00
Forward canopy frame fitting
Details
       

 03-04-2008
3.25
Aft canopy frame preparations
Details
       

 03-02-2008
1.75
Forward canopy fitting
Details
     

 03-01-2008
1.50
Canopy forward frame and skin preparation
Details
     

 02-28-2008
6.00
Canopy release mechanism
Details
       

 02-26-2008
11.75
Canopy latch and static system installation
Details
       

 02-24-2008
2.00
Canopy latch side handle installation
Details
       

 02-20-2008
6.25
Forward upper fueslage riveting, canopy latch...
Details
       

 02-19-2008
4.75
Forward upper fuselage structure riveting
Details
       

 02-18-2008
2.50
Fresh air vent NACA scoop installation
Details
       

 02-17-2008
9.25
Park brake valve and brake line installation
Details
       

 02-09-2008
5.75
Firewall preparation
Details
       

 02-08-2008
3.75
Map box installation
Details
     

 02-06-2008
3.00
Map box preparation
Details
     

 02-04-2008
2.50
Heat valve, pressure transducer manifold install
Details
       

 02-03-2008
1.50
Gascolator installation
Details
       

 02-02-2008
7.25
Battery box, contactors and breather tube clamp
Details
     

 02-01-2008
3.75
Forward upper fuselage component priming...
Details
       

 01-31-2008
9.00
Forward upper fuselage preparation
Details
       

 01-29-2008
1.75
Dismantle forward deck components
Details
       

 01-28-2008
1.50
Dimpling forward upper skin
Details
       

 01-26-2008
5.25
Forward deck installation
Details
       

 01-19-2008
2.25
Sub panel work continued
Details
     

 01-19-2008
2.00
Finishing kit inventory
Details
       

 01-12-2008
5.25
Rollover bar, flap channel and instrument panel wo
Details
       

 01-11-2008
3.00
Rollover bar riveting
Details
     

 01-10-2008
1.25
Rollover bar component priming
Details
     

 01-09-2008
5.50
Rollover Bar Component Cleaning, Abrading and alod
Details
     

 01-03-2008
2.75
More fuel lines and brake line installation
Details
       

 01-02-2008
2.50
Fuel line installation
Details
     

 01-02-2008
1.75
Firewall forward kit inventory
Details
     

 12-19-2007
3.75
Instrument panel considerations
Details
     

 12-15-2007
3.00
Fuel vent line installation
Details
     

 12-14-2007
3.00
Cabin and baggage are floor and side panel instal
Details
     

 12-13-2007
5.50
Empennage fairing installation
Details
       

 12-12-2007
2.25
Systems installation
Details
       

 12-11-2007
3.00
Empenage component mounting
Details
       

 12-04-2007
4.50
Vertical stabilizer mounting
Details
     

 12-02-2007
1.00
Vertical stabalizer mounting preparations
Details
       

 12-01-2007
7.75
Elevator and horizontal stabilizer installation
Details
       

 11-30-2007
9.50
Cabin and baggage floor rib anchor nut installatio
Details
     

 11-24-2007
8.25
Wing lower skin riveting
Details
       

 11-20-2007
2.00
Elevator control rod installation
Details
     

 11-19-2007
2.25
Left elevator closure
Details
     

 11-18-2007
2.25
Right elevator closure
Details
     

 11-17-2007
5.25
Right wing lower skin riveting
Details
     

 11-16-2007
5.50
MD-RA precover inspection and empennage closing
Details
       

 11-10-2007
5.50
Roll over bar installation and aft fuselage riveti
Details
       

 11-10-2007
3.00
Forward deck preperation
Details
       

 11-08-2007
4.00
Roll over bar installation
Details
     

 11-06-2007
3.00
Roll over bar mount angle drilling
Details
     

 11-01-2007
8.75
Fuselage roll over bar fabrication
Details
       

 10-30-2007
1.75
Shoulder harness wear block installation
Details
     

 10-28-2007
4.25
Landing gear mount installation
Details
     

 10-26-2007
5.00
Flap drives system and landing gear mount prepara
Details
       

 10-25-2007
4.00
Seat assembly and forward cabin cover riveting
Details
       

 10-24-2007
7.75
Priming seat components, forward cabin covers...
Details
       

 10-23-2007
5.75
Seat component deburring, edge finishing...
Details
     

 10-19-2007
2.50
Forward cabin cover fitting
Details
       

 10-13-2007
8.00
Seat bottom panel hinge drilling and seat back pre
Details
     

 10-12-2007
2.25
F-757T plate riveting and seat bottom preparation
Details
       

 10-11-2007
3.00
Riveting upper aft fuselage parts
Details
       

 10-10-2007
2.25
Priming upper aft fuselage skins, etc...
Details
     

 10-09-2007
2.50
Cleaning, abrading and aloding aft fuselage parts
Details
     

 10-08-2007
4.25
Aft fuselage upper skin edge finishing, deburring.
Details
     

 10-07-2007
3.25
F-706 bulkhead anchor nut installation
Details
       

 10-06-2007
9.75
Aft fuselage upper skin installation
Details
       

 10-05-2007
4.00
Stub spar and leg installation
Details
     

 10-05-2007
4.25
Priming cabin and baggage area parts...
Details
       

 10-04-2007
2.25
Cleaning, abrading and aloding fuselage parts
Details
     

 10-03-2007
2.50
Edge finishing, riveting and F-695 gusset installa
Details
       

 10-02-2007
3.00
Edge finishing floor panels
Details
     

 10-01-2007
2.25
Riveting aft canopy deck area
Details
       

 09-29-2007
8.25
Fuselage riveting
Details
       

 09-28-2007
1.00
Gear leg to gear mount match drilling
Details
     

 09-26-2007
1.50
Step installation preparation
Details
       

 09-22-2007
5.00
Forward fuselage riveting
Details
     

 09-21-2007
7.50
Forward fuselage re-assembly
Details
       

 09-20-2007
2.50
Riveting various forward fuselage parts
Details
       

 09-19-2007
1.25
Attached anchor nuts to fuselage ribs...
Details
       

 09-18-2007
2.00
Priming F-770, F-772 fuselage skins
Details
       

 09-15-2007
6.25
Forward fuselage pre-riveting preparations
Details
       

 09-14-2007
8.25
Forward fuselage component preparations
Details
       

 09-12-2007
3.00
Edge finishing and dimpling ribs...
Details
     

 09-11-2007
1.50
F-718, F-717 countersinking...
Details
       

 09-10-2007
2.00
Longeron countersinking.
Details
     

 09-07-2007
5.75
Gear leg mount installation
Details
       

 09-06-2007
2.50
Deburring and edge finishing of the F-772 forward
Details
     

 09-05-2007
1.50
Deburring and edge finishing of the left F-770
Details
     

 09-04-2007
1.50
F-770 forward side skin deburring and edge finishi
Details
     

 09-01-2007
7.75
Baggage area framing, step tube mount drilling...
Details
       

 08-31-2007
5.00
Auxiliary fuel pump doubler and floor stiffener in
Details
       

 08-25-2007
7.00
Fuselage forward bulkhead installation
Details
       

 08-24-2007
4.50
F-717 longeron completed and match drilled
Details
     

 08-23-2007
2.75
F-719B angle clip completion, F719 installation...
Details
       

 08-22-2007
2.25
Auxilary longeron installation
Details
       

 08-21-2007
1.50
F-704-L attach strap fabrication
Details
     

 08-20-2007
2.50
Firewall installation
Details
     

 08-11-2007
8.50
F-770 forward side skin bending
Details
       

 08-08-2007
2.50
Match drilling F-770 forward side skins
Details
     

 08-07-2007
3.50
F-718 longeron and F-770 side skin installation
Details
     

 08-04-2007
3.50
Aft fuselage assembly riveting...
Details
       

 08-03-2007
2.00
Notching F-718 longeron and trim conopy decks
Details
       

 08-02-2007
10.00
Fuselage center section outer rib fitting
Details
       

 07-19-2007
8.00
Cleaning, abrading, alodining, priming and rivetin
Details
     

 07-18-2007
3.25
Fribracated various fuselage compontents
Details
     

 07-17-2007
7.75
Aft fuselage assembly riveting
Details
     

 07-16-2007
3.00
Fuselage center section riveting
Details
     

 07-15-2007
2.00
Center section bagage rib riveting.
Details
     

 07-14-2007
1.25
Center section seat rib riveting
Details
     

 07-11-2007
8.75
Rudder/brake pedal installation
Details
       

 07-10-2007
6.25
Fabricated rudder stops and riveted bulkheads...
Details
       

 07-09-2007
2.25
Fuselage center section parts priming
Details
     

 07-08-2007
6.75
Cleaning and alodining fuselage center section par
Details
       

 07-06-2007
2.75
Fuselage center section dimpling and deburring
Details
     

 07-05-2007
2.00
Center section rib edge finishing and deburring
Details
     

 07-04-2007
2.00
Center fuselage preparation
Details
     

 07-02-2007
6.00
Match drilling, deburring,edge finishing and dimpl
Details
     

 06-30-2007
9.25
Alodining and priming and center fuselage prep
Details
       

 06-29-2007
1.50
Cleaning and abrading aft fuselage parts
Details
     

 06-28-2007
3.00
Firewall riveting
Details
     

 06-27-2007
1.25
Riveting the F-705 bulkhead
Details
     

 06-26-2007
1.00
F-705 bulkhead assembling
Details
     

 06-25-2007
3.00
Alodining and priming
Details
     

 06-24-2007
3.75
Cleaning and abrading of aft fuselage parts
Details
     

 06-22-2007
3.00
Aft fuselage assembly deburring and dimpling
Details
     

 06-21-2007
1.50
Aft fuselage assembly deburring and edge finishing
Details
     

 06-20-2007
1.50
Aft fuselage assembly deburring and edge finishing
Details
     

 06-16-2007
6.00
Aft fuselage assembly match drilling
Details
     

 06-12-2007
1.50
Match drill J-channel to aft fuselage assembly
Details
     

 06-08-2007
2.00
Assembling aft fuselage assembly
Details
       

 06-07-2007
4.75
F-718 Longeron Bending, J channel trimming
Details
       

 06-06-2007
8.25
F-707 to F-12 bulkhead preparation
Details
     

 06-05-2007
4.50
F-705 and F-706 bulkhead preparation
Details
     

 06-04-2007
5.00
F-705 Bulkhead preparation
Details
     

 06-03-2007
7.50
F-705 and F-705 bulkhead preparation
Details
     

 06-02-2007
8.25
F-704 Center Section Bulkhead Preparation
Details
     

 06-01-2007
7.50
Firewall preparation
Details
     

 05-31-2007
2.50
Firewall component assembling.
Details
     

 05-30-2007
5.00
Fuselage kit unpacking and inventory
Details
       

 03-11-2007
1.00
Riveted on flap braces
Details
     

 03-05-2007
2.00
Aileron rigging
Details
       

 03-03-2007
10.50
Control tubes, left wing skin and aileron riveting
Details
       

 03-02-2007
4.00
Aileron push tube construction
Details
       

 02-28-2007
1.75
Cut and drilled aileron control rods
Details
       

 02-27-2007
1.25
Right aileron hinge bracket and gap fairing riveti
Details
     

 02-26-2007
1.50
Clecoe on left wing upper skins
Details
       

 02-25-2007
1.50
Riveted the left wing leading edge to the spar
Details
     

 02-25-2007
3.00
Left and right aileron assembling
Details
     

 02-24-2007
4.00
Left wing leading edge riveting
Details
       

 02-23-2007
7.00
Left wing skin preparation
Details
       

 02-22-2007
5.75
Flap brace and aileron fairing preparation
Details
       

 02-22-2007
3.50
Cleaning, abrading and alodining
Details
       

 02-17-2007
3.00
Closing the left wing tank
Details
     

 02-16-2007
3.50
Left wing leading edge deburring
Details
     

 02-15-2007
6.50
Left wing leading end finishing
Details
       

 02-14-2007
6.25
Left wing skin debur, edge finish and dimple
Details
     

 02-09-2007
5.75
Installed right fuel tank, removed left wing skins
Details
       

 02-08-2007
4.00
Right wing tank sealing and left lower skin
Details
       

 02-07-2007
1.75
Left wing tank sealing
Details
       

 02-07-2007
2.00
Left wing tank fuel quantity indication installati
Details
     

 02-06-2007
1.50
Left wing tank sealing
Details
     

 02-03-2007
5.25
Left wing tank sealing and riveting
Details
     

 01-27-2007
4.25
Left wing tank preparation
Details
       

 01-26-2007
4.50
Left wing tank preparation
Details
     

 01-25-2007
6.25
Left wing tank preparation
Details
       

 01-06-2007
5.75
Left wing tank match drilling and deburring
Details
       

 01-05-2007
4.00
Left wing tank Z bracket preparation
Details
       

 01-04-2007
2.00
Left wing leading edge to fuel tank joint plate
Details
       

 01-03-2007
2.00
Match drilled left wing leading edge
Details
     

 01-02-2007
1.00
Clecoed left leading edge and left top skin
Details
     

 01-01-2007
1.75
Rivet left wing rear spar
Details
       

 12-31-2006
5.25
Right wing upper skin riveting
Details
       

 12-30-2006
4.50
Finished sealing of right wing tank
Details
       

 12-29-2006
2.00
Aileron component dimpling
Details
     

 12-28-2006
1.75
Aileron component deburring and edge finishing
Details
       

 12-27-2006
2.00
Aileron skin match drilling
Details
       

 12-26-2006
2.25
Aileron assembly
Details
     

 12-25-2006
2.00
Aileron Spar preparation
Details
     

 12-21-2006
5.75
Started on the ailerons
Details
     

 12-20-2006
2.50
Reriveted leading edge rib flanges
Details
     

 12-19-2006
1.50
Right wing tank sealing
Details
     

 12-15-2006
2.75
Right wing tank sealing
Details
       

 12-14-2006
2.50
Right tank sealing
Details
     

 12-11-2006
1.25
Cleco cleaning and fuel access panel drilling
Details
     

 12-09-2006
5.00
Right wing fuel tank work
Details
       

 12-08-2006
2.50
Right wing tank preparations
Details
       

 12-07-2006
2.00
Landing light installation
Details
     

 12-06-2006
2.00
Right wing landing light
Details
       

 12-05-2006
2.00
Landing light installation
Details
     

 12-03-2006
2.00
Making a manometer
Details
     

 12-02-2006
8.00
Right wing tank sealing
Details
       

 12-01-2006
3.50
Riveting
Details
     

 11-30-2006
1.25
Riveting
Details
     

 11-29-2006
1.75
Riveting
Details
     

 11-28-2006
1.75
Flap assembling and riveting
Details
     

 11-27-2006
2.50
Priming flap compontents, flap assembly fixture
Details
       

 11-26-2006
4.00
Cleaning, abrading and alodining
Details
       

 11-23-2006
1.75
Countersinking and dimpling
Details

 11-22-2006
1.75
Deburring and edge finishing
Details

 11-21-2006
1.00
Deburring left flap components
Details

 11-20-2006
1.25
Flap actuation input rod attach plate and angle
Details
     

 11-18-2006
9.50
Rivet leading edge, build flaps
Details
       

 11-17-2006
3.50
Dimpling of right aft spar, nut plates and rivetin
Details
       

 11-16-2006
2.25
Priming right wing parts
Details
       

 11-15-2006
3.00
Cleaning, abrading and alodining.
Details
     

 11-14-2006
1.50
Deburring and countersinking
Details
     

 11-13-2006
1.00
Edge finishing and dimpling
Details

 11-12-2006
1.25
Deburring
Details

 11-11-2006
2.50
Deburring, edge finishing and dimpling
Details

 11-10-2006
2.00
Deburring, edge finishing and dimpling
Details

 11-09-2006
2.25
Deburring, dimpling and edge finishing
Details
       

 11-08-2006
1.50
Dimpling right wing tank skin and skin stiffeners
Details
     

 11-07-2006
2.00
Right tank deburring edge finishing
Details
     

 11-06-2006
1.00
Tank drain, pitot tube opening and rib engraving
Details
       

 11-05-2006
2.25
Right fuel tank access and filler neck
Details
       

 11-04-2006
2.50
Tank inboard rib bracket and fuel quantity capacit
Details
       

 11-04-2006
2.50
Right wing tank installation
Details
       

 11-03-2006
1.00
Right tank inboard forward attach bracket
Details
     

 10-28-2006
3.25
Right wing tank preperations
Details
       

 10-27-2006
2.00
Z bracket edge finishing and tank skin stiffeners
Details
     

 10-26-2006
1.75
Right fuel tank attachments
Details
       

 10-25-2006
5.00
Match drilling right leading and fuel tank
Details
     

 10-24-2006
6.00
Right wing skin match drilling
Details
       

 10-18-2006
2.50
Right wing upper skin installation
Details
       

 10-17-2006
0.75
Right wing spar sag removal
Details
       

 10-16-2006
1.00
Replaced bad rivet on aft spar
Details
     

 10-14-2006
8.00
Right wing main rib riveting
Details
       

 10-13-2006
2.25
Wing assembly fixture work
Details
       

 10-13-2006
1.00
Left wing aft spar doubler riveting
Details
     

 10-12-2006
4.00
Left wing rib, aft spar priming, plus...
Details
       

 10-11-2006
3.50
Left wing rib and aft spar cleaning, abrading and
Details
     

 10-10-2006
1.50
Aft spar doubler riveting
Details
     

 10-09-2006
2.00
Right wing rib and spar priming
Details
     

 10-08-2006
3.50
Right wing rib anti-corrosion treatment
Details
       

 10-07-2006
4.25
Deburring wing rib flange holes
Details
     

 10-07-2006
2.50
Deburring right wing rib to spar attaching holes
Details

 10-06-2006
5.50
Wing rib flange fluting and straightening
Details
       

 09-29-2006
3.50
Wing rib flange edge finishing
Details
     

 09-25-2006
1.00
Wing rib relief notch edge finishing
Details

 09-24-2006
2.00
Wing rib edge finishing
Details
     

 09-22-2006
3.00
Wing rib lightening hole and flange edge finishing
Details
       

 09-21-2006
1.00
Wing rib edge finishing
Details
     

 09-20-2006
1.00
Edge finishing of wing ribs and aileron hinge brac
Details
     

 09-16-2006
2.25
Wing Tie Down and Elevator Bellcrank Installation
Details
       

 09-16-2006
1.00
Flap Brace Preparation
Details
       

 09-16-2006
6.25
Aft Spar Preparation
Details
     

 09-15-2006
7.50
Main Spar Preparation
Details
       

 09-14-2006
5.00
Wing Spar Flange Anchor Nut Installation
Details
       

 09-13-2006
3.25
Main Spar Flange Anchor Nut installation
Details
     

 09-12-2006
2.00
Wing Main Spar Flange preparation
Details
     

 09-07-2006
0.50
Completing wing kit inventory
Details

 09-06-2006
1.50
Carry out inventory
Details

 09-05-2006
3.00
Wing kit arrives
Details
       

 09-01-2006
0.00
ABF Freight Sytems and CCRA visit
Details

 08-31-2006
0.00
ABF Freight Systems called
Details

 08-29-2006
0.00
Letter from Van's
Details

 08-07-2006
0.00
Letter from Van's
Details

 07-10-2006
0.00
Wing Kit order faxed to Vans
Details

 03-26-2006
6.00
Left elevator and tab riveting
Details
       

 03-25-2006
6.00
Right HS skin riveting and rudder trailing edge ri
Details

 03-23-2006
9.00
Rudder trailing edge
Details
     

 03-22-2006
2.75
Rudder assembly
Details

 03-21-2006
1.50
Rudder spar doubler plate installation
Details

 03-18-2006
11.00
HS and VS assembly
Details
       

 03-17-2006
3.25
Finish riveting elevator skin stiffeners
Details

 03-16-2006
3.50
Finish priming parts, start riveting skin stiffene
Details

 03-15-2006
5.00
Priming parts
Details
       

 03-01-2006
5.00
Clean, abrade and alodine elevator & rudder frames
Details

 02-28-2006
5.00
Clean, abrade and alodine Rudder skins
Details

 02-27-2006
5.00
Clean, abrade and alodine HS and VS skins
Details

 02-22-2006
3.50
Edge finishing
Details

 02-21-2006
5.50
Identification marking
Details

 02-20-2006
5.50
Identification mark rudder components...
Details

 02-06-2006
1.75
Elevator tab preparation
Details

 02-06-2006
5.00
Build elevator trim tab
Details
       

 02-05-2006
7.00
Left elevator frame and horn preperation.
Details
       

 02-04-2006
7.50
Right elevator frame and horn preperation.
Details
       

 02-03-2006
1.25
Debur and dimple Elevator skins and skin stiffener
Details

 02-02-2006
1.75
Match drill and debur elevator skin stiffeners
Details

 02-01-2006
1.00
Elevator skin stiffener edge finishing
Details

 01-31-2006
1.25
Trim and edge finish elevator skin stiffeners
Details

 01-29-2006
5.00
Elevator skin stiffeners
Details
     

 01-28-2006
1.00
Rudder trailing edge wedge
Details

 01-26-2006
5.00
Rudder preparation
Details
     

 01-25-2006
2.00
Build rudder skeleton
Details

 01-23-2006
1.50
Rudder skin stiffeners
Details

 01-21-2006
5.75
Rudder skin stiffeners
Details

 01-20-2006
2.25
Deburing VS parts
Details

 01-19-2006
2.00
Match drill VS spars, ribs and skin
Details

 01-18-2006
1.00
VS spar, spar dounbler and rib preparation
Details

 01-18-2006
2.00
Dimple left HS frame and skin
Details

 01-17-2006
1.00
Dimpled right HS skin
Details

 01-16-2006
1.00
Dimpled right HS skin
Details
       

 01-13-2006
0.75
Deburring HS parts
Details

 01-13-2006
1.25
Deburring
Details

 01-12-2006
6.00
Right HS preparation
Details

 01-11-2006
6.25
HS preparation
Details
       

 01-05-2006
5.00
Horizontal Stabilizer Spar assembly
Details

 01-04-2006
1.75
Inventory Empennage Kit
       










Copyright © 2001-2024 Matronics. All Rights Reserved.